Natatorium (Architect JJCA)
This project included a new natatorium structure with an elevated Olympic-sized competition swimming pool, along with a smaller instructional pool. Locker rooms and support facilities for the football stadium were also included. Est. construction cost: $14 million.
Theater (Architect JJCA)
A new 52,000-square-foot, $14-million, 678-seat performing arts theatre. The structure includes a full fly tower, lighting catwalks, dressing rooms, scene shop, and a green room.
Ensworth High School (Hastings Architecture)
A new high-end private school campus located on a 124-acre site. The project consists of a total of 224,000 square feet in six separate buildings which include: an academics building; commons building; arts building; athletic building; administration building; and a clock tower. Also included are athletic fields and viewing stands for high school competition.
Ensworth Tennis Center
A three-story 155,000 square foot indoor athletic facility including two levels of post-tensioned concrete parking structure; six full size indoor tennis courts in a 49,000 square foot column-free, steel-roofed area; and spectator and locker room spaces.