Archive

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]An 18-story parking structure constructed of eight stories in the ground, four stories above ground, and six future floors.  Each floor plate is 45,000 square feet for a total of 810,000 square feet.  The structure is post-tension concrete with one-way slabs and beams and concrete frame for lateral loads.[/vc_column_text][/vc_column][/vc_row]...

A new, one-story, three-bay facility.  The apparatus bay was constructed of load-bearing CMU.  Conventional wood-framing was used for the living quarters.  The roof was constructed with long-span roof trusses....

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]A new, 14,500-square-foot, steel-framed police precinct.  The structure is framed with steel joists and utilized steel “X” bracing for resistance to lateral loads.  The building was designed as an essential facility.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]This project consists of the renovation of an existing structural pre-engineered metal building into a police station and crime lab.  The design includes structural upgrades to meet current seismic and wind loading requirements for an essential facility.  A 40,000-square-foot, composite-steel mezzanine was constructed within the existing building.  This project also includes a firing range for ballistic testing.[/vc_column_text][/vc_column][/vc_row]...

Project consists of the renovation of an existing medical office building into a new police station.  The renovation required the structure to be upgraded to meet current wind and seismic requirements.  This project also includes a firing range for ballistic testing....

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]A new, three-story police headquarters that includes a 911 call center and parking garage.  The building is approximately 95,000 square feet and is constructed with post-tension concrete beams and slabs.[/vc_column_text][/vc_column][/vc_row]...

Projects consisted of the design of new replacement fire stations at multiple locations for the city of Nashville.  These structures are both one and two stories.  Load-bearing CMU walls supporting hollow-core precast planks with wood roof trusses was the typical framing system....

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]2019 Feature in Urban Land Magazine Project involved the renovation of a mechanical service garage into an architectural office space.  The project involved the design of new openings and interior framing.[/vc_column_text][/vc_column][/vc_row]...

[vc_row css_animation="" row_type="row" use_row_as_full_screen_section="no" type="full_width" angled_section="no" text_align="left" background_image_as_pattern="without_pattern"][vc_column][vc_column_text css=""]Project involved the renovation of a historic downtown Franklin building - removal of existing wood columns and the strengthening of the upper floors.[/vc_column_text][/vc_column][/vc_row]...

Major rehabilitation of an existing hardware store into an office building.  The entire structure had to be analyzed for modern codes, and major structural modifications were required for the new functions....